| NBCI, Cumberland, Maryland |
|
| North Branch Correctional Institution (NBCI) Cumberland MD DGS State of Maryland 2005-2008 $55,000,000 Description: A 1024 Bed Maximum Security Facility constructed of pre-cast concrete split into two housing units (3&4). Leuterio Thomas was the structural consultant to DMJM Design
|
 |
| WMATA OCC Interior |
|
|
Operations and Control Center, Carmen Turner Facility
Landover MD
Washington Metropolitan Area Transportation Authority
2006-2008
$7,500,000 (65,000 Square Feet)
Description: A two storey interior renovation adding a mezzanine floor providing the new operations and control center for all of WMATA’s rail and bus operations. Leuterio Thomas provided architectural and structural design support including the permitting process and third party inspection program and construction administration.
|
 |
| TSA National Airport |
|
|
TSA Systems Integration Facility (TSIF)
Reagan National Airport, VA
Transportation Security Agency
2007
$100,000
Description: Rapid building evaluation of the former USPS facility to determine if the facility met the future program requirements for the TSIF based on codes, life safety issues, MEP systems and structural performance. Included in the submission was a list of immediate upgrades required
|
 |
| Fall Protection System |
|
|
Fall Protection Systems - WMATA
Montgomery, Bladensburg, Four Mile Run & Landover
FPS
2007
Fee $30,000
Description: WMATA required the installation of 10 fall protection systems in four of its bus garages. Leuterio Thomas was required to survey the existing facilities to determine that the roof structures could take the additional loads and then provide drawings and calculations and confirm the as-built conditions.
|
 |
| Cohen Building - DHHS - GSA |
|
|
GSA Cohen Building - HVAC Upgrade
Washington DC
GSA
2003
$4.0M
Description: Leuterio Thomas provided structural design services to support JVP (MEP) replace and upgrade the HVAC systems for the Cohen Building including opening the roof structure to drop in new units.
|
 |
| Stair Replacement - Iwo Jima WMATA |
|
|
Vent Shaft Stair Replacement
Iwo Jima Memorial Arlington VA
WMATA
2007
$525,000
Description: The existing stair had corroded because of water damage and needed to be replaced. The revised IBC 2003 required that the stair layout be redesigned to function as an escape stair between stations. Leuterio Thomas provided architectural, structural and cost estimating services.
|
 |
| 4 Bus & 4 Rail HVAC Upgrades |
|
|
4 Rail - 4 Bus HVAC Project
West Falls Church, Bladensburg, Landover, Southern Avenue, Montgomery, New Carrolton, Brentwood
WMATA
2006
$300,000
Description: Leuterio Thomas was required to survey each of the facilities to determine whether the new HVAC units can be installed on the roof and if so where in relation to the existing structure and whether the roof needed additional supports
|
 |
| Platform Edge Replacement WMATA |
|
|
Platform Edge Replacement
Deanwood and Minnesota Avenue, Rockville, Shady Grove, Twinbrook, Takoma, Brookland and Fort Totten
WMATA
2006-2008
$N/A
Description: Leuterio Thomas provided structural and architectural design services to develop the concept designs for the replacement of the platform edges using pre-cast concrete elements. Given the rigid time constraints due to operational requirements for the trains, the components had to be installed at night and weekends
|
 |
| Oxon Hill Manor, Fort Washington |
|
|
Oxon Hill Manor Restoration
Oxon Hill Maryland
Maryland National Capital Parks Planning
2004
$1.5M
Description: Hedy Thomas provided consulting services to McMullan Associates, the engineer of record for the structural design and renovation of this historic facility.
|
 |
| US Embassy, Abuja, Nigeria |
|
|
US Embassy - Abuja
Nigeria
US Department of State
2003
$53M
Description: Hedy Thomas worked as a consultant to DMJM Design providing the lead structural designer for the project completing the structural drawings from schematics through construction documents and the specifications following the upgrades State department requirements for secure and blast resistant design
|
 |
| Embassy of Egypt, Washington DC |
|
|
Embassy of Egypt Washington DC Egypt 1989 $N/A Description: Hedy Thomas provided consulting services to DMJM as the lead structural designer for the project utilizing pre-cast concrete units.
|
|