logo
301-203-1784
  • Home
  • About Us
  • Our Team
  • Clients
  • Portfolio
  • Contact

FDIC

  • Project Image
  • Project Image
  • Project Image
  • Project Image
  • Project Image
  • Project Image
  • Project Image
  • Project Image
  • Previous
  • Next
  • Previous
  • Next
Location: Washington, DC
Client: FDIC/GSA
LT Role: Architect of Record & Structural Engineer of Record
Type: Renovation, Survey, Window Replacement, Security, Blast Analysis, Tenant Fit-Out, Bridging Documents

LT’s design team developed the strategy and planning to completely replace all of the building systems while it remained occupied. To support that challenge LT designed a temporary mechanical system to be installed on the roof allowing new equipment in the penthouse. Submissions to NCPC and CFA passed through without a delay. During the design analysis, it was apparent that the windows needed to be replaced to meet thermal standards. Given that opportunity FDIC requested LT install new windows to Level 3 blast resistance. A separate structural frame was required for each window to attach it to the main building structure. In removing the window units, and capturing perimeter shaft space while at the same time upgrading the wall insulation, LT was able to increase the building square footage by nearly six thousand square feet. LT provided high quality renderings of the new spaces.

← Back

Have Questions ? Contact Us Now

Contact Us

About Us

A woman owned firm, growing strong with over 18 years’ experience in the industry. Read More

Navigation

  • Home
  • About Us
  • Our Team
  • Clients
  • Portfolio
  • Contact

NEWSLETTER

Sign up for our monthly newsletter.

Contact Us

Corporate Office:
6710 Oxon Hill Road, Suite 300
National Harbor, MD 20745
301-203-1784
info@leuteriothomas.com
© 2025 Leuterio Thomas
Custom Web Design by Studio98
Privacy Policy

Notifications